Regional Environmental Assessment of Renewable Energy:
Environmental Report
7.4.2.6
Summary
Table 40.
Assessment of the potential effects of the Draft Plan on infrastructure
Development
Phase
Impact Pathway
Exposure to Change
(Magnitude and
Likelihood)
Sensitivity of
Change
Importance of
Feature
Significance
Mitigation
Residual Impact
Cable Routeing
Operation
Cable crossing requirements with existing marine
and/or terrestrial infrastructure
N-L
M
M
Minor/Insignificant
-
-
Onshore
Substation
Construction
Direct damage to existing terrestrial infrastructure
N-L
M
M
Minor/Insignificant
-
-
Reduced access to existing infrastructure for
maintenance or repair activity
N-L
M
M
Minor/Insignificant
-
-
Operation
Direct damage to existing terrestrial infrastructure
N-L
M
M
Minor/Insignificant
-
-
Reduced access to existing infrastructure for
maintenance or repair activity
N-L
M
M
Minor/Insignificant
-
-
Decommissioning
Direct damage to existing terrestrial infrastructure
N-L
M
M
Minor/Insignificant
-
-
Reduced access to existing infrastructure for
maintenance or repair activity
N-L
M
M
Minor/Insignificant
-
-
Onshore Wind
Turbine
Construction
Direct damage to existing terrestrial infrastructure
N-L
M
M
Minor/Insignificant
-
-
Reduced access to existing infrastructure for
maintenance or repair activity
N-L
M
M
Minor/Insignificant
-
-
Operation
Direct damage to existing terrestrial infrastructure
N-L
M
M
Minor/Insignificant
-
-
Reduced access to existing infrastructure for
maintenance or repair activity
N-L
M
M
Minor/Insignificant
-
-
Decommissioning
Direct damage to existing terrestrial infrastructure
N-L
M
M
Minor/Insignificant
-
-
Reduced access to existing infrastructure for
maintenance or repair activity
N-L
M
M
Minor/Insignificant
-
-
N
Negligible
L
Low
M
Medium/moderate
H
High